Studio update
- August 16th, 2009
- Posted in photography
- Write comment
WOW! It sounds sooooo important! Well, actually, just got a load of white and black material for backdrops and (I think) 9m of flooring! (I only need 3m lol). The floor will only be laid down loose. Plans maybe soon to semi fix it to the floor so it can be lifted easily for protection when not in use. It should be set up today and proper tests done (using black background).
Results to follow soon.

First shots at the studio and the results are brilliant.Onward and upward.The night went really well,relaxed but constructive and the results are here to be seen.
Brilliant shoot and shots M1, mine to follow.